PROJECT REFERENCE LIST

Power Generation Feasibility studies (e.g. waste heat recovery) for Middelburg Ferrochrome, Exxaro and other clients.

Professional Engineer on a project to convert a 4-pack boiler plant from coal firing to natural gas firing for Johannesburg Hospital.

Boiler Plant Audit (pressure parts, operations, control & instrumentation & process parameters) for ArcelorMittal. Design, performance testing and combustion optimisation of biomass

Optimization & process design of the pre-boiler feedwater heating plant for Palabora Mining Company.

(pomace) fired boiler plant, grit collectors and various package boilers.

HP & LP Steam line design, CAESAR analysis & drawing package of new steam lines for Marine Biotechnology Products, Mauritius, ALSTOM John Thompson Boilers, Armstrong Steam, Pioneer Foods, Tiger Brands Langeberg, Parmalat, Peninsula Beverages, Sappi Milnerton, TFD, Rainbow Chickens, Fish Meal Producers.

High energy (180 bar, 525 oC) piping assessment, finite element modelling on CEASAR II and the development of a maintenance plan to manage the ASME B31.1 Main Steam, Hot Reheat and Cold Reheat lines at Paiton Energy (Utility), Indonesia to ensure long term plant health.

Boiler Engineering for ALSTOM on the return to service project of Komati Power Station, Mpumalanga, South Africa.

backnext

OUR COMPANY

 

Introduction   

Mission & Vision   

Company Structure   

Clients   

Contact Us   

ASSOCIATES

 

Carab Amrex   

Carab Technologies   

MBC   

PRODUCTS & SERVICES

 

Service List   

Training Courses 2012   

Case Studies & Articles   

Downloads   

MISCELLANEOUS

 

Staff Album   

Community Pics   

Recruitment   

Copyright © 2011 Tekniva. All rights reserved. http://www.tekniva.co.za/legalnotices